Rendering of Building III

A Firm Foundation for Growth

Airport Commerce Center III positions you within the Southside/Airport submarket—Metro Louisville’s largest area for industrial business.

In addition to an outstanding location, the facility offers game-changing features right on-site to maximize your productivity and enhance your capabilities.

Building Three: Coming Q2 2018

  • Available Space 677,685 SF
  • Available Space Dimensions 1,188' x 570'
  • Dock Doors (100) 9' x 10' Dock Doors with 7' x 8' 40,000 lb. Levelers, Seals, and Bumpers.
    Expandable to 135.
  • Drive-In Doors (4) 12' x 14' Drive-In Doors
  • Clear Height 36’
  • Office Area Build-to-Suit
  • Loading Bay 54' x 60'
  • Column Spacing 54' x 56'3"
  • Fire Protection System K-22/K-17 ESFR High Piled Combustible Storage with 2,000 gpm Electric Fire Pump
  • Parking Vehicle:
    342 Spaces, Expandable to 394
    Trailer:
    160 Spaces
  • Lighting LED
  • Year Built 2018
  • Structure Interior R-11.4 Precast Concrete
  • Site Area 40.6± Acres
  • HVAC Systems Rooftop, Direct-Fire Gas to Provide 55° F at 8° F Outdoor Temperature
  • Zoning EZ-1
  • Electric 4,000 Amp, 480 Volt, 3-Phase, 4-Wire Secondary
  • Floors 7" Unreinforced 3,500 psi Concrete Slab Over 4" Compacted Granular Base
  • Roof 45 mil Ballasted Single Ply EPDM over 3.5" R-20 Expanded Polyisocyanurate Insulation
  • Utility Providers Natural Gas & Electric:
    Louisville Gas & Electric
    lge-ku.com

    Water:
    Louisville Water Company
    louisvilleky.gov/LWC

    Sewer:
    Metropolitan Sewer District
    msdlouky.org